久久免费视频澳门|无码一级久久精品|天堂√一区二区三区|99er奇米影视|久久成人综合视频|高清无码成人网在线观看|亚洲欧美综合美日韩互日三区|久久99热视亚洲色图麻豆|伊人久久最新地址|成人免费视频ā片在线观看

Located in wedbank coalfield, South Africa, Kral coal mine invested in the construction of a 3.0mt/a dry coal preparation plant in 2010 to separate No. 2 thermal coal. The ash content of raw coal is 40.4%, the ash content of cleaned coal after beneficiation is 30.6%, and the recovery rate is 85%. It is mainly sold to power plants. The dry separation plant has an hourly processing capacity of 500 tons and an annual operation of 6000 hours. It has the advantages of short investment payback period, low operation cost and high recovery rate.

KRAL COAL MINE

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE