久久免费视频澳门|无码一级久久精品|天堂√一区二区三区|99er奇米影视|久久成人综合视频|高清无码成人网在线观看|亚洲欧美综合美日韩互日三区|久久99热视亚洲色图麻豆|伊人久久最新地址|成人免费视频ā片在线观看

Liyuanhe coal mine of Xuangang coal power company built a 2.4mt/a dry process coal preparation plant in 2014. In order to further improve the efficiency of the coal preparation plant and reduce costs, the mine entrusted Shenzhou group to contract and operate in October 2016, so as to realize the high-quality and efficient operation of the coal preparation plant. Since the plant has been operated by Shenzhou, the coal preparation output has increased, the energy consumption has been significantly reduced, the separation accuracy has been greatly improved, and the calorific value of cleaned coal has increased by 1200kcal / kg, which has won the recognition of customers with professional services and achieved mutual benefit and win-win results.


ITEM

yield Wt%

ASH Ad%

Qnet,ar,Kcal/kg ? NET CALORIFIC VALUE Qnet,ar,Kcal/kg

RAW COAL

100

49.29

3525

CLEAN COAL

72.20

37.19

4574

REJECT

27.80

80.73

801

XUANGANG COAL POWER COMPANY OF DATONG COAL MINE GROUP

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE